PRECISION CAST CONCRETE | FAST | LOW MAINTENANCE |
|
|
| TOWN
| BENDCRETE SKATE PRODUCTS INSTALLED | |
| ALLERTON BYWATER
| 1.5m high half pipe, 3 x 1.5m quarter pipes, 1.5m high flat bank, 0.6m high jump box, 0.4m fun box with grind block | ||
COCKFIELD
| 1.2m quarter pipe, 1.2m flat bank, 0.5m driveway with grind rail | ||
| EASTRINGTON
| 1.2m high quarter pipe, 1.2m high flat bank, stand alone grind block, stand alone grind rail, 0.4m high fun box with grind block | ||
| GRIMSBY
| 1.5m high half pipe, 2 x 1.5 m high quarter pipe, 2 x 1.5 m high flat bank 1 with decending grind rail, 1 0.6m high driveway, 1 0.6m high fun box with grind block, stand alone grind rail | ||
| HUNMANBY
| 1.2m half pipe, 2 x 1.5m quarter pipes, 0.5m fun box with grind block, 1.5m flat bank, stand alone descending grind block | ||
| KIRKLEES
| Bendcrete Installed - Details to follow | ||
LEEDS
| Very large park consisting of: 1.2m half pipe linked to 1.5m half pipe, 1.5m half pipe linked to 1.5m high spine, 1.5m roll over, 0.5m half pipe, 5 x 1.5m quarter pipes 2 x 1.8m quarter pipe, 3 x 1.5 flat banks, large fun box consisting of descending grind rail, small 0.5m driveway, curved grind block, manual pad, large stepped grind block, 2 stand alone grind rails, stand alone curved grind rail (covering 2 tennis courts) | ||
| POCKLINGTON MONTESSORI SCHOOL - EAST RIDING
| 1.5m high half pipe, 2 x 1.5m quarter pipes, 2 x 1.5m flat banks, 0.4m high fun box with grind block, 0.6m high driveway, stepped grind block, 2 x stand alone grind block, stand alone grind rail | ||
RETFORD
| 4 x 1.5m high quarter pipe, 1.2m high quarter pipe, 1.2m high flat bank, large 0.5m high fun box with grind block and descending grind rail, stand alone grind rail, stand alone grind block | ||
| ROTHERHAM
| 1.5m half pipe, 2 x 1.5m flat banks, 1.5m high quarter pipe, 0.9m jump box linked to hips, 2 x stand alone grind rails | ||
SHEFFIELD (DEVONSHIRE GREEN)
| Large bowled out street area with replicated Lloyds 3 steps | ||
SHEFFIELD
| Bendcrete Installed - Details to follow | ||
SHEFFIELD
| Bendcrete Installed - Details to follow | ||
STONEBRIDGE - HULL
| 1.2m high quarter pipe, 1.2m high flat bank, stand alone grind block, stand alone grind rail, 0.4m high fun box with grind block | ||
THIRSK
| 1.5m high halfpipe, 3 x 1.5m high quarter pipe, 1.5m high flat bank, 0.6m high jump ramp, 0.5m high fun box with grind block, stand alone grind block | ||
THORNE - DONCASTER
| 1.2m high half pipe, 1.2m quarter pipes x 2, 1.5m high flat banks x 2, 0.4m high fun box with grind box, 0.6m high driveway, stepped grind block.l | ||
WHITBY
| Bendcrete Installed - Details to follow | ||
| BENDCRETE SKATE RAMPS, 2 BRIDGEVIEW BUSINESS CENTRE, BRIDGE St, ABINGDON, OXFORDSHIRE OX14 3HN TEL: 01235 530278 FAX: 01235 530278 | ||
©COPYRIGHT BENDCRETE SKATE RAMPS 2006 |